Live Chat
Osceola Sectional Hero
Administration Building - Community Development Department
 
Hours
M - Th: 7:30AM - 5:00PM; Fri: 9:00AM-5:00PM
 
Phone
(407) 742-0200
 
Address
1 Courthouse Square,
Suite 1100
Kissimmee, FL 34741

Electronic Plan Submission

Step 1: Digitally Sign Your Documents

Florida Statutes and  Florida Administrative Code require Architects and Engineers to sign and seal documents that are submitted for public records.

Engineers can refer to the FBPE January 2016 Newsletter for general information. Engineers are required to have their digital signature certified through a Third-Party Certification Authority.

Digital Signature Requirements:

Example of a Digital Signature
  • Image of licensee Seal (as set forth in each discipline governing board)
  • Name of licensee
  • Date the document was digitally signed
  • The following language statements:
    • "This item has been electronically signed and sealed by [LICENSEE NAME] using a Digital Signature." (Date will be shown automatically with an Adobe System)
      "Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies."

Digital signatures (or IDs) can be created using Adobe Acrobat. For more information, please follow Adobe's guide.

Step 2: Name Files Appropriately

Files must be named in accordance with the format shown below. 

Discipline Names:

  • A = Architectural
  • C = Civil
  • D = Documents (all permitting documents, truss packets and truss drawings, etc.)
  • E = Electrical
  • F = Fire Protection
  • G = General (found on most commercial submissions)
  • H = Hardscapes
  • L = Landscapes
  • M = Mechanical
  • P = Plumbing
  • R = Reports (Geotech, Soils, etc.)
  • S = Structural
  • T = Telecommunications
  • X = Other Disciplines (Kitchen, Interior Design, etc.)
 

Example of Appropriate Document Names:

D01_Application P19-000018.pdf
D02_Site Plan.pdf
D03_Product Approvals.pdf
D04_Truss Engineering Packet.pdf

Example of Appropriate Blueprint Names:

A01.pdf
G01.pdf
E01.pdf
E02.pdf

Step 3: Upload Documents for Review

Login to your account on our Permit Center website, and upload your documents. 

Read our step by step user guide here.