Royal Palm Culvert Replacement Project
The Buenaventura Lakes Royal Palm Culvert Replacement project replaces the drainage culvert crossing at Royal Palm Drive to provide a more efficient drainage crossing. It involves the installation of three (3) 5-foot diameter drainage pipes. Paired with the eventual construction of the Buenaventura Lakes Stormwater Master System Alternate Outfall, this Project will help reduce upstream flooding and flood recovery times.