Boggy Creek Road Project
Project Details
This project consists of widening Boggy Creek Road from two to four lanes from Simpson Road to Narcoossee Road. The total project length is approximately 5.9 miles. The project includes multimodal accommodations, as determined in the Project Development & Environment (PD&E) study, associated drainage improvements and storm water ponds, modification of the signalized intersections at Nele Road, Turnberry Boulevard, and CR 15 (Narcoossee Road), upgrading the Intelligent Transportation Systems (ITS), modification/replacement of the triple box culvert over Jim Branch Creek and street lighting. For information on construction alerts, please visit www.osceola.org/go/trafficalerts.
Final Design Plans
- 01 Boggy Creek Road Roadway Plans Final
(185mb PDF. To view, Right-Click > Save Link As) - 02 Boggy Creek SPM Plans Final
- 03 Boggy Creek Signals Plans Final
- 04 Boggy Creek Road ITS Plans Final
- 05 Boggy Creek Lighting Plans Final
Documents and Reports
- Alternatives Evaluation Report
- Bridge Culvert Evaluation Report
- Contamination Screening Evaluation Report
- Cultural Resource Assessment Survey
- Existing Conditions Report
- Lighting Justification Report
- Natural Environmental Evaluation Memo
- Pond Siting Report
- Project Traffic Analysis Report
- Public Involvement Plan
- Public Involvement Summary Part A
- Typical Section Technical Memorandum
- Utility Assessment Package
Contact Info
Maria Claudia Durango Dickson
Email: MariaClaudia.Durango@qcausa.com
Phone: 407-304-7636
www.osceola.org/go/boggycreek