Partin Settlement Road Project
Project Details
The project includes the widening/reconstruction of the existing two-lane Partin Settlement Road from CR 525 (Neptune Road) to Lakeshore Boulevard to a four-lane roadway, for a distance of approximately 2.7-miles. A Part ‘A’ alternatives study was conducted to consider different alignments and Part ‘B’ included the design of a preferred alignment. The project includes construction of a four-lane divided roadway with multi-modal accommodations, associated drainage improvements and storm water ponds, modification of the signalized intersections at Neptune Road, Cross Prairie Parkway, US 192, and Lakeshore Boulevard, upgrading the Intelligent Transportation System, modification/replacement of double box bridge culvert over Fish Lake Canal, street lighting and landscaping considerations. For information on construction alerts, please visit www.osceola.org/go/trafficalerts.
Signed and Sealed Plans
- PS-20-11504-DG-PLANS-01-ROADWAY-FINAL_1
(130mb PDF. To view, Right-Click > Save Link As) - PS-20-11504-DG-PLANS-02-SIGNINGMARKING-FINAL
- PS-20-11504-DG-PLANS-03-SIGNALIZATION-FINAL
- PS-20-11504-DG-PLANS-04-ITS-FINAL
- PS-20-11504-DG-PLANS-05-LIGHTING-FINAL
Project Development and Environment Study Documents
- Line and Grade Plans
- Cultural Resource Assessment Survey Partin Settlement Road
- Existing Conditions Report
- Project Traffic Analysis Report (PTAR)
- Level 1 Contamination Screening Evaluation Report
- Alternatives Technical Report
- Hold North 96’ Right-of-Way
- Part A Public Involvement Summary Report
- Public Involvement Plan
- Lighting Justification Report
- Box Culvert Hydraulic Study
- Natural Resources Report
- Pond Siting Report
- Existing Right of Way and Utilities
Contact Info
Lisa Mark
Email: Lisa.Mark@qcausa.com
Phone: 321-917-1716
www.osceola.org/go/partinsettlement