Cyrils Drive Improvement Project
Project Details
Osceola County is working closely with Tavistock, the developers of Sunbridge, to make a series of road improvements along Cyrils Drive. The improvement project, which is funded largely by development fees, is split into five different segments, as the map above depicts. Construction on intersection improvements at Narcoossee Road and Cyrils Drive should begin in the summer of 2021 and take approximately four to five months to complete. Concurrently, design is under way to widen Cyrils Drive from Narcoossee Road to Absher Road from two lanes to four lanes, with right-of-way acquisition expected to begin in the fall of 2021. Construction on this segment, a rendering of which is pictured below, is anticipated to begin in late 2023 and will include sidewalks, bicycle accommodations, curb and gutter and drainage improvements. Construction on Phases 1 and 2 of the Cyrils Drive improvements has been completed; Phase 3 is currently under construction. Phases 1, 2 and 3 are all located within the Sunbridge development.
Project Documents
Phase 1, 2 and 3
Cyrils Widening Narcoossee Road to Absher Road
100% Construction Plans
- Signed & Sealed Cyrils Dr Full Plan Set 2023-10-27
- 100% Cyrils Dr Full Plan Set 2023-05-05
- 11 Cyrils Dr Landscape Plans
- 14 Cyrils Dr & Zuni Rd 60% Signal Plans
- 100% Temporary Traffic Control Cost Opinion
- 21190 Cyrils Drive Road Widening 100% MOT Ph 1A-1B 050523
- 21190 Cyrils Drive Road Widening 100% MOT Ph 1C 050523
- 21190 Cyrils Drive Road Widening 100% MOT Ph 2 050523
- 21190 Cyrils Drive Road Widening 100% MOT Ph 3 050523
90% Construction Plans
- 90-17042 038B Design Documentation
- 90-Cyrils Drive Widening 90% Construction Plans
- 90-Cyrils Drive Widening Conceptual Tree Plan
- 90-Cyrils Drive Widening Ecological Impact Summary Report
- 90-Cyrils Drive Widening Geotechnical Report Ponds
- 90-Cyrils Drive Widening Geotechnical Report Roadway
- 90-Cyrils Drive Widening MDR 09-27-21
- 90-Cyrils Drive Widening Revised Underdrain Evaluation Report
- 90-Cyrils Widening - Secondary Map
- 90-Cyrils Widening - Secondary
- 21190.1 Cyrils Drive Widening Lane Closure eSign 020822
- 21190 Cyrils Dr Widening 90% MOT Plans 020822
60% Construction Plans
Cyrils Drive and Narcoossee Road Intersection Improvements
Contact Info
Stephanie Underwood, P.E.
Email: Stephanie.Underwood@osceola.org
Phone: 407-742-0565
www.osceola.org/go/cyrilsdrive