This project will reconstruct Neptune Road from two-lanes to a divided 4-lane roadway between Partin Settlement Road to U.S. 192, a distance of approximately 3.98 miles. To qualify for federal and state funding, a Project Development and Environment Study (PD&E) was performed for the County. Details of that study can be found by clicking on the PD&E Phase tab at left. The Project is currently in the design phase of development, which will be followed by construction. For information about the design of the Neptune Road improvements, please click on the Design tab at left. That page will include information about design plans as they are completed and public meetings as they are scheduled.