Neptune Road Project PD&E Phase
A Project Development and Environment (PD&E) study was conducted to evaluate improving a 3.9-mile segment of Neptune Road, between Partin Settlement road and U.S. 192. The study evaluated various alternative improvements and their impacts to the physical, natural, social and cultural environments. An Alternatives Public Information Meeting was held on April 11, 2019 to obtain public input. Following that meeting, a recommended preferred alternative was identified as a combination of Alternative 1 (North) and Alternative B (5-lane), with both segments to be modified to reduce impacts and right-of-way acquisition costs. The recommended Preferred Alternative was adopted by the Osceola County Board of County Commissioners on May 13, 2019. A copy of that presentation is available for review here: BoCC Presentation 5-13-2019. The Preferred Alternative refinements were then presented at a Public Hearing on September 24, 2020 and that information is available on the Public Hearing 9-24-2020 page.
The PD&E study was completed on January 28, 2021, which allowed the project to further advance into the design phase of development. All final documents associated with the PD&E study are posted at left under the Final Supporting Documents page. For additional information on the progress of design plans, please review the Design Phase page.
To ask questions about the PD&E study, please contact the Project Manager below.
Joshua DeVries
Joshua.DeVries@osceola.org
407-742-7813
1 Courthouse Square, Suite 3100
Kissimmee, FL34741
PD&E Final Supporting Documents
Newsletters
- Volume 1, September 2018 (English) | Volumen 1, Septiembre 2018 (Español)
- Volume 2, March 2019 (English) | Volumen 2, Marzo 2019 (Español)
- Volume 3, September 2020 (English) | Volumen 3, Septiembre 2020 (Español)
Documents & Reports
- Neptune Road PD&E - Air Quality Screening Analysis - July 2019
- Neptune Road PD&E - Announcement of LDCA
- Neptune Road PD&E - Comments and Coordination Report - November 2020
- Neptune Road PD&E - Concept of Operations for ITS - January 2020
- Neptune Road PD&E - Concept Plans - July 2020
- Neptune Road PD&E - Conceptual Stage Relocation Plan - January 2020
- Neptune Road PD&E - Contamination Screening Evaluation Report - January 2020
- Neptune Road PD&E - Cultural Resource Assessment Survey - October 2019
- Neptune Road PD&E - Design Variation Request Segment 1 - December 2019
- Neptune Road PD&E - Design Variation Request Segment 2 - December 2019
- Neptune Road PD&E - ETDM Summary Report - February 2021
- Neptune Road PD&E - Farmland Conversion Form and Memo - February 2020
- Neptune Road PD&E - Florida Bonneted Bat Acoustic Survey - July 2020
- Neptune Road PD&E - Geotechnical Investigation Report - December 2019
- Neptune Road PD&E - Location Hydraulics Report - February 2020
- Neptune Road PD&E - Natural Resource Evaluation - July 2020
- Neptune Road PD&E - Noise Study Report - February 2020
- Neptune Road PD&E - Pond Siting Report - February 2020
- Neptune Road PD&E - Ponds Cultural Resource Desktop Analysis - August 2019
- Neptune Road PD&E - Preliminary Engineering Report - January 2021
- Neptune Road PD&E - Project Systems Engineering Management Plan - December 2019
- Neptune Road PD&E - Project Traffic Analysis Report - March 2020
- Neptune Road PD&E - Section 4(f) Resources - January 2021
- Neptune Road PD&E - Traffic Analysis Methodology - August 2019
- Neptune Road PD&E - Type 2 Categorical Exclusion - January 2021
- Neptune Road PD&E - Typical Section Package - June 2020
- Neptune Road PD&E - Utility Assessment Package - September 2019
- Neptune Road PD&E - Water Quality Impact Evaluation - November 2019